Building Details:
• Year Built: 1983
Additional Improvement information:
• 15+ acres with minerals leased
• 140,400 square feet
• Column spacing 30’ x 60’
• Building is equipped with a fire suppression sprinkler system capable of dispersing .4 gallons per minute per square foot
• Restrooms on manufacturing floor 3
• Rail Siding Need Can off/on load 1 car on west dock and 2 cars on east dock. 8-10 rail cars can be spotted on rail siding. Rail line serving property is Kansas City Southern Rail (operated by WATCO)
• Ceiling height Center 32’ Eve Height 28’
• Crane Capability: (six total) One 10 TON; One 7.5 TON; Three 5 TON; One 1.5 TON
• Over Head Doors: 4 Dock Height doors 10’ x 12’ (truck well) located at front of building with manual dock levelers; seals and bollards
3 Grade level sliding doors located at rear of plant of varying sizes; Single over head door that accesses truck well capable of spotting two tractor trailers with automated dock levelers and dock locks
3 grade level over head doors serving east side of facility
• Lighting: High Pressure Sodium Vapor fixtures throughout plant floor
Electrical: East side-one 2,000 KVA transformer with secondary voltage 480 volts/3 phase (owned by AEP/SWEPCO); West side-two 2,000 KVA transformers with 575 volt secondary voltage (only one is currently active). One 2,000 KVA transformer 480 volt AC; one 2,000 KVA transformer 4,160 secondary voltage.
• Lines for pneumatic tools throughout plant (no. of drops 50+)
• Lab/testing area in manufacturing area
OFFICE AREA
• 2 Story office area 7,200 square feet total, 3,600 square feet per floor
• 2’ x 2’ acoustical ceiling tile
• 2’ x 4’ lay in fluorescent lighting fixtures (4 bulb)
• Sheet rock walls covered either will vinyl wall covering or wall paper
• Commercial grade level loop carpet over pad
• Central HVAC four 10 ton units serving office space with one 2.5 ton unit specifically dedicated to the server room within office area. Plant area is served by three 5 ton units serving laboratory space, restrooms and plant office space
• 2nd Story is primarily engineering/training area
• Restrooms 2 on ground floor; 1 on second floor
• Areas not carpeted have vinyl tile flooring
Request Property Information
Please describe your commercial real estate requirements. We’ll introduce you to local properties that match your criteria.
